| Quality Management |
| [2014-7-26 17:03:15] |
Quality management system
Corrective Action Request (CAR)
Revision Change by Engineering Change Order (ECO)
First articleFirst article is provided when a customer specifically requests for it. In a rare case if first article is rejected, manufacturing has 10 working days to implement corrective action or customer has the option to cancel order Internal AuditTorreyvac’s contract manufacturing is required to go through internal audits in order to maintain ISO9001 certification. Audit report will be presented upon customer’s request. Control of nonconforming productTorreyvac ensures that product which does not conform to requirement is identified and returned in one of the following ways.
RMAWhen a part is rejected by customer, Torreyvac issues RMA # along with credit memo to credit the amount back to customer. Inspection at receivingStandard parts are inspected by QC at the manufacturing facility to ensure quality is maintained. Inspection report and/or certificate of performance will be provided at the request by customer. Torreyvac performs random inspection at visual level such as cosmetics, label and packaging. |